日本免费视频-日本妈妈3-97人人澡-校霸被c到爽夹震蛋上课高潮-成人精品在线视频-天干夜夜爽爽日日日日-一级黄色录象-日韩在线你懂的-黄色激情av-91视频免费在线-亚洲精品高潮-99re只有精品-天堂综合网久久-人人人人爽-成年人香蕉视频-黄色一区二区视频-精品66-亚洲天堂av片-日本大胆人体视频-999福利视频

當前位置: 首頁->廢棄欄目->English->News->Company News

Asia’s First Cylindrical FPSO Arrives at Operation Area

來源:      時間: 2026-05-26

On May 29, Haikui No. 1, China’s self-developed and Asia’s first cylindrical floating oil-gas production, storage and offloading (FPSO) facility, arrived at the sea area where the Liuhua Oilfield is located.

Haikui No. 1 is a high-end marine facility integrating the functions of crude oil production, storage, and offloading. It consists of nearly 600,000 parts, and has a weight of nearly 37,000 tons, a height close to a 30-storey building, and a maximum oil storage capacity of 60,000 tons. With a design life of 30 years, it can operate at sea for 15 consecutive years.

Haikui No. 1 was transported with the combination of the following two methods: “Being loaded on a large ship” and “being towed by smaller ships.” It completed a voyage of more than 1,300 nautical miles from Qingdao, Shandong to the destination across the Yellow Sea, the East China Sea, and the Taiwan Strait.

The project team coped with the loading/unloading of ultra-large structures, transportation design, plan preparation, and complex calculations, established a land-sea emergency response and support system, responded to a broad array of complex situations such as sweeping tides, harsh climatic conditions, and concentrated fishing areas with scientific methods. At last, Haikui No. 1 was transported to the operating area three days ahead of the planned date.

After arrival, Haikui No. 1 will be connected to the anchor leg in the deep sea by 12 mooring lines whose lengths total 2,570m. It will operate at a depth of 324m.


相關圖片:

相關附件: